Deployment ring
Also: rollout ring, update ring, staged rollout
A deployment ring is a group of devices that gets an update at the same stage of a rollout. An update reaches a small ring first and moves to the next, larger one only once it has proved itself in the ring before.
UPDATED
Rings split a rollout into stages. Each stage is a gate the update has to pass before the next, larger group gets it, so a bad update reaches a few machines before it reaches the rest.
How rings are usually set up
Microsoft describes rings as simply a way to separate devices into a deployment timeline. Each ring is a group of users or devices that receive an update at the same time, and each has criteria, such as a deferral time or an adoption target, that must be met before the update goes to the next, broader ring. A common structure has three:
- Preview, for the people who plan and test, usually IT;
- Limited, a pilot on devices representative of the whole fleet;
- Broad, everyone else.
The names vary: “First, Fast, Broad” and “Canaries, Early Adopters, Users” are both common, and Intune’s update rings are often set up as test, pilot and production. There is no right number. A large organisation may split rings by site, or keep mission-critical machines back until the broad ring is done.
Advancing from one ring to the next
Microsoft names two strategies:
- Red button: an update is good until proven bad. It flows on its own, and someone presses stop when a problem shows.
- Green button: an update is bad until proven good. It waits in each ring until someone signs it off.
Manual steps slow an update down, so Microsoft favours the red button where speed is the goal.
Rings in Attestree
Attestree rolls out third-party apps, from winget, Chocolatey and Scoop, through four rings in a fixed order: canary, pilot, broad, all. Chocolatey and Scoop packages are tested on a Hyper-V detonation host only, and nothing is read from their public repositories until you allow it, which ships switched off.
- One ring per endpoint. Each endpoint is in exactly one ring, for every app. Its ring is set when it enrolls, from the enrollment token, or by hand on its page. An endpoint with no ring is in
all, the most cautious, and a Community Edition endpoint starts there. Moving an endpoint to another ring never uninstalls or downgrades anything. - Promote. Promoting a version makes it the one a ring installs. The version it replaces stays armed beside it as the ring’s rollback target. Since 26.11.1300 a ring can also serve a family-line version beside the head, and promoting either never replaces the other. A family line flies the newest older version that still offers an installer family the newest version dropped, such as msi for PowerShell 7.6 beside the MSIX-only 7.7. A version cannot skip a ring: the ring before must have it.
- Roll back. Rolling a ring back makes its armed version the active one again, one ring at a time, behind a typed confirmation.
- Soak. Each ring has a soak floor, by default an hour in canary, a day in pilot, three days in broad and a week in all, which you can change per tenant. Unattended updates wait out the longer of the floor and a dwell time before promoting a version onward. A person promoting by hand is checked only for the ring before.
- Halts and the stop. Automated promotion halts a ring that fails or stalls, and the halt waits for a person: update halts lists them. The emergency stop refuses every promote and rollback while it is on.
- When an endpoint installs. Maintenance windows and the CVE deadline decide when an endpoint installs what its ring already serves. They do not move a version between rings.
Withhold, retire or roll back covers taking a version out of every ring at once, and rollout operations on real endpoints covers watching a rollout land.